Optimising ion exchange column operation - Efficient removal of brine after regeneration
Computational fluid dynamics (CFD) was used to simulate ion exchange regeneration with brine. Brine wash out could be optimised, shortening the cycle time. Project together with Evides industriewater (Netherlands).
Client:
Solutions:
No items found.
Location:
Date:

Curing dead zones in lower part column
Brine removal after resin regeneration was calculated and optimised. The density of the brine solution is much higher than that of water. In the original configuration, brine severely interfered during operation after regeneration. Different geometrical adaptations were tested. The period of salt flushing out could be significantly shortened.

Major findings
- Lower part of column contained dead zones
- Brine washed out slowly during normal operation
- The implemented geometrical improvements significantly lowered the impact of brine



No items found.
No items found.
Contact us
Fill out the form and a member of our team will reach out to you to discuss how we can help.
Contact sales:
Oops! Something went wrong while submitting the form.
Suggested Projects
View all projects
No items found.
Subscribe to our newsletter